Founder

Heye Power Consultants

2023 – Present
High CurrentAmpacityData CentersManufacturingConsulting

Overview

Heye Power Consultants was born on the Tesla Gigafactory. While working on the project through 2M, we were doing extensive design-assist work on high-current power distribution — and someone asked a simple question: could we invoice for this consulting work? The answer was a profitable yes. So we spun it off as its own entity in 2023. What started as an observation on a factory floor became a dedicated consulting practice bringing first-principles engineering and hands-on field experience to the most demanding power challenges in manufacturing and data centers.

Key Achievements

01

Tesla Gigafactory Origin

Born directly from design-assist work on the Tesla Gigafactory — through a pandemic and the devastating 2021 Texas freeze. We kept delivering critical parts when others couldn't, earning recognition from the top. That resilience and the consulting work it required proved our expertise was independently valuable enough to spin off from 2M.

02

$25M+ with Elon's Companies

Between 2M and Heye Power, we've done over $25M combined with Elon's companies — and expect to double that within a year. What started as an $870K win on the Gigafactory has become one of our largest ongoing relationships.

03

High-Current Specialization

Established a consulting practice focused specifically on high-current and ampacity systems — a niche that demands rare depth of expertise.

04

Data Center & Manufacturing Focus

Serving the biggest names in data centers and manufacturing — Microsoft, Amazon, Apple, Meta, CyrusOne, Vantage, EdgeConneX, and more. These are the markets where power distribution errors are most costly: data centers (downtime measured in millions per hour) and heavy manufacturing like gigafactories.

Challenges & Solutions

Consulting credibility requires proof

My track record at Power Busway and background in controls engineering provides the proof points that clients need. I'm not theorizing about these systems — I've built, sold, and installed them.

Exponentially growing power demands

AI and cloud computing are driving data center power requirements to unprecedented levels. Staying ahead of this curve through continuous education and hands-on project work.

Processes Implemented

01First-Principles Assessment

Every engagement starts from the physics of the problem — conductor sizing, thermal analysis, fault current calculations, and code compliance reviewed from scratch rather than relying on rules of thumb.

02Field-Validated Recommendations

Recommendations are grounded in what actually works in the field, not just what looks good on paper. Installation feasibility, maintenance access, and real-world operating conditions are always considered.

Lessons Learned

The gap between theoretical engineering and field reality is where the most value lives. Bridge it and you become indispensable.

In high-current systems, thermal management is everything. Undersizing a conductor by one gauge can mean the difference between a reliable system and a fire.

The best consulting relationship is one where the client's team is smarter after every engagement. Teach, don't just report.

Gallery

elon-tesla-suppliers-tweet.jpg

Elon Musk publicly thanking Tesla suppliers — April 2021, prompted by a text after delivering through the pandemic and Texas freeze

Elon Musk publicly thanking Tesla suppliers — April 2021, prompted by a text after delivering through the pandemic and Texas freeze

heye-power-assessment.jpg

On-site power system assessment

On-site power system assessment

heye-power-analysis.jpg

Ampacity analysis and thermal modeling

Ampacity analysis and thermal modeling